La Quinta, CA
Home MenuTravertine
Name: Travertine
Location: Southeast portion of the City, bounded by Coral Mountain on the northwest, Avenue 60 to the north, U.S. Bureau of Reclamation Dike No. 4 on the east.
Status: Approved
Description: The Project would amend the adopted Travertine Specific Plan to provide for the development of a mix of uses including up to 1,200 dwelling units of varying residential product types and two community parks (east and west) on 378.8 acres; a 38.3-acre resort/spa facility with a 45,000-square-foot boutique hotel with a 175-seat restaurant, 97,500 square feet of resort villas, and 8,700 square feet of spa and wellness center; a 46.2-acre resort/golf facility with a 5,500-square-foot golf academy, a 1,000-square-foot clubhouse, and 10,000-square-foot banquet restaurant (500-seat capacity). The Project also proposes on-site and off-site drainage infrastructure, and recreational open space consisting of a 5-mile public trail system, staging areas, gathering areas, and passive and active spaces on approximately 55.9 acres. Natural open space land uses are proposed on approximately 301.2 acres on the southern portion of the Project property for conservation and preservation purposes.
Applications: General Plan Amendment (GPA 2017-0002), Zone Change (ZC 2017-0002), Specific Plan Amendment (SP 2017-0004), Tentative Tract Map (TTM 2017-0008), and Development Agreement (DA 2021-0001).
Applicant: TRG Land
Acreage: 855 acres
Project Planner: Cheri Flores, Planning Manager
Planner Contact: (760) 777-7067, CLFlores@LaQuintaCA.gov
Travertine Specific Plan Amendment
Planning Commission Meeting - May 28, 2024
Agenda Packet, Video Recording, Meeting Minutes
The Planning Commission continued the public hearing to June 25, 2024.
Planning Commission Meeting - June 25, 2024
Agenda Packet, Video Recording, Meeting Minutes
Planning Commission approved a recommendation for City Council approval.
Planning Commission Resolution No. 2024-008 (EA)
Planning Commission Resolution No. 2024-009 (GPA, ZC, SP, TTM, DA)
City Council Meeting - August 6, 2024
Agenda Packet, Video Recording, Meeting Minutes
City Council approved the project.
City Council Resolution No. 2024-033 (EA)
City Council Resolution No. 2024-034 (GPA, SP, TTM)
Final Environmental Impact Report (FEIR)
Draft Environmental Impact Report (DEIR)
EIR Technical Appendices
- Appendix A - NOP and Comment Letters
- Appendix B.1 - LESA Report_Altum Group_2018
- Appendix B.2 - LESA Report Update_TRG Land_2021-06-10
- Appendix C.1 - AQ Report_UXR_2021-10-13
- Appendix C.2 - AQ-GHG Operational MEMO_UXR_2023-01-31
- Appendix D.1 - Biological Assessment_MBI_2022-06-03
- Appendix D.2 - Utility Field Biological Assessment Memo_MBI_2023-10-11
- Appendix D.3 - JD_MBI_2021-06
- Appendix D.4 - JD Addendum_MBI_2021-11-23
- Appendix D.5 - Joint Project Review_CVCC_2021-02-02
- Appendix E.1 - Cultural Report_Final_Nonconfidential_SWCA_2021-11-21
- Appendix E.2 - 2006 & 2017 Cultural Reports_Nonconfidential_SWCA
- Appendix F - Supplemental Energy Memo_MSA
- Appendix G.1 - Geotechnical Report_NMG_2021-08-27
- Appendix G.2 - Paleo_Nonconfidential_SWCA_2021-11-21
- Appendix H - GHG Report_UXR_2021-10-13
- Appendix I.1 - Radius Report_EDR_2021-06-14
- Appendix I.2 - Phase 1 ESA_Geo Forward_2023-01-20_w cover
- Appendix J.1 - Hydrology Study_Proactive_2021-11-12
- Appendix J.2 - WQMP_Proactive_2021-09-23
- Appendix J.3 - Drainage Master Plan_Q3_2021-06-10
- Appendix K - Land Use Consistency Analysis_2023-08-17
- Appendix L.1 - Noise Study_UXR_2023-04-18
- Appendix L.2 - Offsite Noise Memo_UXR_2022-12-14
- Appendix M.1 - TIA Report_UXR_2021-09-27
- Appendix M.2 - VMT Evaluation_UXR_2021-09-27
- Appendix N.1 - Adopted WSA_2018-02-21
- Appendix N.2 - WSA Verification Letter_2021-06-24